Structural Chemical Fixing S-2495E
|
Step 1 Drill hole with minimum 2mm clearance. |
Step2 Extrude the chemical fixing into the hole with a standard chalking gun. |
|
Step 3 Push in fixing sleeve (if required) followed by bolt or threaded bar. |
Step 4 Leave to cure. Bolt can be removed by turning counter clockwise as with mechanical fixing. |

