Structural Chemical Fixing S-2495E

 

 

Step 1

Drill hole with minimum 2mm clearance.

Step2

Extrude the chemical fixing into the hole with a standard chalking gun.

 

Step 3 

Push in fixing sleeve (if required) followed by bolt or threaded bar.

 

Step 4

Leave to cure.  Bolt can be removed by turning counter clockwise as with mechanical fixing.


Latest News
Best Sellers
Site Map Privacy Terms & Conditions